Starting excavation. A land survey was previously done and there are markings to go by while digging.
First footings trenches. It is actually cost effective to have some of the shallow trenches done by hand. A laborer will earn anywhere between MX$ 220-300/day. If you have to go deeper than bedrock level then a backhoe is best and probably the only way. You see backhoes with hydraulic breakers attached everywhere around Mérida.
No comments:
Post a Comment