Building the knock-out portion of what will be an arch. The shape is formed an allowed to cure then the structural beam is poured on top and down the pre-formed sides of the arch. After concrete cures the formwork is removed and the knock-out portion taken down leaving the arch in place.
No comments:
Post a Comment